2013年5月5日 星期日

Replacing Handlebar


 Loosen the 4 bolts , hex size 12mm 

Remove the brake lever light switch in front of the right brake reservoir
Right side brake reservoir, 2 hex size 8mm

 Unscrew the 2 philips screw for the right control hub

 Left side mirror Hub.
 Left rubber grip loosen with a chopstick and some silicon spray
 The vibration dampener weight is locked with 2 hook and pressed with a screw driver to release it.
 The whole dampener is pulled out and replaced.

The vertical alignment is based on the left mirror which should be vertical in the base.

Do not over tighten the  12mm bolts as the raiser is made of aluminium.

This job takes 30-45 mins. The dealer charge me HKD 400  for this and it is a fair price.

沒有留言:

張貼留言